Most of the interior walls will be demolished. This
building can be subdivided to accommodate a variety of
uses and size requirements. Note that the remaining
interior walls can be removed. There are presently 5
loading docks located to the rear and side of this
portion of the building. Due to the elevation of the slab
to the finished ground, any number of docks can be
building for access. The exterior of the main building
will have a complete facelift. The concrete walls will be
painted, landscaping refurbished, and the parking lot
will be capped with greenway components installed.