423 total acres including over 100 undeveloped acres. Owner
willing to subdivide. Capable of supplying up to 7,000,000
gallons of water per day, as well as processing up to
5,700,000 gallons per day of sewage through its on-site
treatment plant. Rail service from Conrail with seven tracks
directly into the facility. On-site 6MW co-generation system
with 200,000 pph pulverized coal boiler rated at 650 psig.
Process steam available @240,000 pph at 120 psig. Raw
material (grain, malt, corn, etc.) unloading (vacuum) system
and storage silos.